MoorparkRepair

Tuesday, August 16, 2005


This is a closeup of the edge of the floor area where the cabinet was removed. It's hard to tell from here, but the area under the cabinet is 3/4" subfloor. But the rest of the floor has another 1/4" of flooring on top of that. Then the linolium is on top of that. Posted by Picasa

0 Comments:

Post a Comment

<< Home